Monday, March 4, 2013

day 119

Hubby and disagreed on how long it'd been seen I'd taken real (e.g. non-iPhone) photos of the house.  I said a week.  He said two.  It kills me to admit that he was right.


Where have the past two weeks gone?  Oh, I know.  A week away for a work conference and then a week for month-end close.  Add in some unplanned (but super successful) potty training and time flies.  So freaking fast sometimes.  Like the fact that my son is now two and a half.  When did that happen?  I swore I just brought him home from the hospital and learned just the right way to swaddle him so that he kept at least one arm snuggled.  Now, he's parading around like a big boy, willing to share his latest bodily movements with just about anyone.

Anyway, I digress.

This past week, in particular, has been a busy one.  Flooring work continued, we met with the granite folks to do a rough layout, trim was delivered, lighting was installed and cabinet installation began.  Cabinets were supposed to start going in on Monday, but due to delays in flooring and trim delivery, the carpenter re-scheduled for Friday afternoon.  Everything is finally starting to come together and the place is looking more and more like a house.  And I think, for the first time Sunday night, I finally had the realization that it's our house... and we'll be making it our home.  It's not just a project we've spent countless hours working on, waiting to hand off to someone else.  Pretty exciting stuff.

I'm mostly going to let the photos speak for themselves.  But, I need to say this -- I love my hardwood floors.  Love, love, love them.  They're the Ponderosa line from Real Hardwood Floors and we chose Alamosa Hickory.  The color is just dark enough, without being too dark -- and just warm enough, without being too red.  And don't mind the dirt; I'll take better photos once the dust settles and the protective paper is removed.

[wall color: Gray Clouds by Sherwin Willams - flooring: Ponderosa Alamosa Hickory by Real Wood Floors]
The tile in the main bath was the first flooring laid - and the one we were least excited to see.  That sounds so anticlimactic, but it's true.  It's a very pretty beige tile.  It really is.  But the tile in my master bath?  And the hardwood floors?  So much more exciting.

[wall color: Nantucket Dune by Sherwin Willaims - tile: Sandolo Acacia Beige by Daltile]
And while I prefaced the master bath tile with being even more exciting, we're still waiting for the best part to be completed.  The floor tile is in - and it's beautiful.  But, we're still waiting on the vein-cut tile to go up in the shower.  It's the tile I originally fell in love with, but ultimately decided to restrict to just the shower because it only came in the large 12x24-inch size.  Our bathroom is somewhat galley style (is it appropriate to describe a bathroom as 'galley'?).  With a narrow center walkway, we feared the large tiles would be overwhelming to the space.  Bummer.

[wall color: Perfect Greige by Sherwin Williams - tile: San Michele Crema Cross-Cut by Daltile]
[the good is coming... this is the bad and the ugly]
[wall color: Perfect Greige by Sherwin Williams - tile: San Michele Crema Cross-Cut by Daltile]

The electricians worked hard to install fixtures and complete wiring over a few different days.  We have been beyond pleased with these guys and I'm super thankful for their laid back manner and willingness to answer my ten thousand questions.  Examples:  Are you installing a doorbell? (A: Yes)  The hallway light seems to be in a really weird place - is that right? (A: That's the smoke detector - the light box was drywalled over)  Can you wait to install our dining room fixture?  I don't want it to get dirty. (A: Sure)  On second thought - can you wait to install the shades on the other drum lights?  I don't want them dirty either. (A: No problem)  On third thought - can you also wait on the kitchen pendants and vanity lights?  (A: Already planning to)  Seriously can't thank them enough for their patience with me.

[Harbor Breeze 44-in Bellevue Ceiling Fan in the two bedrooms]
[Hampton Bay Altura 68 in. Indoor Oil Rubbed Bronze Ceiling Fan in the Living Room] 
[allen + roth 12-in W Bronze Traditional Pendant Light with Clear Shade in the foyer]
[allen + roth 12-in W Bronze Traditional Pendant Light with Clear Shade in the kitchen]
The only bad part about all of these fixtures going up so quickly was our lack of planning in purchasing light bulbs.  When we got the call on Monday that they were ready for fixtures the next day, I had a momentary freak-out that we hadn't purchased any light bulbs.  Oooops.  We'd also forgotten to purchase the motion light for the side of the house.  Double oooops.

I immediately started making a list of the fixtures, required numbers of bulbs and ideal wattages and Hubby began scouring Lowe's and Menards for exterior motion lights.  I'm happy to report that between my diligent list making, Hubby's diligent shopping, and a properly-timed sale at Lowe's, we did end up getting everything out to the house by the next day.  And with only one mistake.  We decided to 'go green' and try LED lights for the first time in the bedroom ceiling fans.  Well, they were the wrong size...or the wrong shape...or something.  Lucky for us, the fans came with bulbs and we just hadn't noticed.  I'll mess with the LED bulbs later, and for now, will be thankful to return $60 worth of light bulbs.

[Harbor Breeze 60-in Saratoga Oil-Rubbed Bronze Ceiling Fan with Light Kit in the master bedroom]
[allen + roth Semi-Flush Mount Light in the back hallway]
[Hampton Bay Altura 68 in. Indoor Oil Rubbed Bronze Ceiling Fan in the Living Room] 
[allen + roth 12-in W Bronze Traditional Pendant Light with Clear Shade in the kitchen]
[Patriot Outdoor Double Glass Wall Light by the garage]
They really busted their you-know-whats to get most of the electrical done and I believe the following is just about all that's left:
- Install large drum pendant in the dining area.
- Install shades on smaller drum fixtures in laundry room, flex room and master closet.
- Install single sconces in master bathroom (flanking each pivot mirror).
- Install vanity lights in main bath (above mirrors).
- Install kitchen pendants above peninsula.
- Return LED light bulbs.
- Install exterior motion light.
- Pick up a replacement glass shade from Lowe's (so thankful only one fixture has been damaged - and luckily it's one we picked up in town).


The trim was delivered on Friday morning while we were at the house.  The delivery truck ended up blocking us in the driveway, so we spent quite a bit more time at the house than we'd intended.  Someone started to get a wee bit bored and started hiding in closets.  Adorable, no?


NOTE: This update  has been semi-drafted since Friday evening but I'm just now getting the chance to wrap it up.  Interested in what's happened since Friday?


Swoon!  More details to come.

Sunday, February 24, 2013

day 112

Ready for another list?

1. I like the paint colors.  Phew.  We had selected Valspar colors from Lowes but the painter uses Sherwin Williams, so we were forced to find new colors.  The kitchen was almost an exact match (Gull by Valspar vs. Gray Clouds by Sherwin Williams) but the master bath wasn't (Smoked Oyster by Valspar vs. Perfect Greige by Sherwin Williams).  I like the master bath color quite a bit, but until I see it with the granite and cabinets, I won't be 100% sold.  The main bath color I actually like better (Light Raffia by Valspar vs. Nantucket Dune by Sherwin Williams).  I was unable to get good photos this weekend, but here's a preview of what the new color palette looks like:

[color samples from Sherwin Williams]
2. The trim was finally finished being installed on the front of the exterior!  It's amazing what a difference it makes having that one piece up.

3. After a bit of drama, our kitchen faucet has arrived.  We decided on the Wheaton by Pfister and ordered it from build.com on January 31.  We were aware that there was about a one week delay for shipment, but when I received an e-mail on the 15th that it might not ship until February 28, I started freaking out a bit.  Their customer service team was great to work with, but ultimately we ended up cancelling the order because their shipments from Pfister were on back-order.  We found a new faucet being sold from a user on Amazon for $50 cheaper so it ended up working out for the best.  Despite being a tad nervous about the condition, it arrived in the original box, in mint condition.  Yay for small victories (savings)!

[Wheaton by Pfister from build.com]
4. Flooring started going in on Friday!  The main bath, fireplace hearth and half of the master bath tile was laid on Friday (day 110).  The hardwood floor started being laid out on Saturday (day 111) and they were back out working on the tile again today (day 112).


5. I did a bit of shopping at Restoration Hardware today.  The towel rings, toilet paper holders and towel bars at the big box home improvement stores are cheap.  In price and quality.  I've been hesitant to spend the money for decent ones, but I'm finally giving in.  The Restoration Hardware outlet had a matching towel ring and toilet paper holder so I picked them up for the powder room.  I thought I had been diligent about comparing finishes at the store, but upon getting home, I realized one was polished chrome and the other was polished nickel.  Ugh.  Hopefully I'll be the only one to notice.  But, for $32 each instead of $55, I was happy with my purchase.

[Chatham Tissue Holder by Restoration Hardware]
[Chatham Towel Ring by Restoration Hardware]
6. I also picked up some hardware for the main bathroom.  We'll use the pulls on the middle three drawers and the knobs on the two doors.  These were $4.99 each instead of $11.00.  Have I mentioned I love the outlet?

[1-1/4" Aubrey knob by Restoration Hardware]
[4" Aubrey pull by Restoration Hardware]
[Portrait series in Maple - Sable by Merillat]

7. I almost bought pulls (the Gilmore) for the master bathroom vanity but ended up putting them back.  The only con to the outlet is their no return policy.  I still love the pulls, but I was worried how they would fit on the top drawers. I'm having a really hard time picking out hardware for this vanity.  Any ideas or suggestions?  We're looking for polished chrome without fussy details.  Our inspiration vanity actually just uses simple knobs for everything.

[Gilmore pull by Restoration Hardware]
[master bath vanity]

Source: houzz.com via Amy on Pinterest

8. The hole in our master bedroom floor was patched.  However, our floor is starting to look a little Frankenstein-like.  I had requested the floor vents be moved from under our windows (and ultimately under our nightstands) immediately after they were cut out.  So, now we have three patches - and another large seam along one of the side walls.  I know it's only the subfloor but I worry about the integrity of the patches over time.

9.  We hit up Home Depot on Saturday and finally purchased the hardware for the kitchen cabinets.  I'm happy with both the price and style.

[Cup Pull by Liberty Hardware from Home Depot]
[Contempo Knob by Liberty Hardware from Home Depot]
10. Finally, we started sanding and priming the Craigslist dresser tonight!  So far so good, but I'm still completely stuck on what color I want to paint it.  Ivory?  Light gray?  Charcoal?  Yellow?  Light blue?  So many possibilities.  Anyone have some uh-mazing inspiration photos to share that will help me make up my mind?














Saturday, February 23, 2013

day 104

I had a work conference all week and am just now downloading the photos I took last weekend.  Better late than never, eh?

The stone work is done!  The masonry team started on Wednesday (day 101) and was finished the next day.  It looks great in person and I think will look even better once the front door has been stained.  It's so hard to tell from small samples how things will ultimately look and the stone is one area where the samples weren't quite representative of the full product.  Hubby likes it more than he was expecting to and I like it slightly less.  It's growing on me, though.



[does it get much cuter than this?  the hands in the pockets melt my heart.]

The piece of trim that is missing above the front porch drives me crazy.  I'm pretty sure it was fixed this past week, though.  Amazing how a simple thing can make such a difference.  Also?  I'm anxious to see the front pillars built up the rest of the way.  We really wanted to bring the stone higher, but ultimately decided it wasn't worth the cost.  I'm sure seeing the upper sections boxed in and painted will make a big difference on the overall curb appeal.



Our main reason to stop by the house was to measure for our dining table (first mentioned here).  I want a large table, but because it's not going to have leaves, I want to make sure it's not too big for the space.  We ultimately decided on a 7-1/2 foot long table that's at least 42-inches wide.



The cardboard cutout was done to size, so it gave us a nice idea of what we'll be working with.  I'm planning to put a buffet along the wall on the right and may add a small bar cart behind the patio door on the left.  We're also thinking of doing a mix of upholstered chairs, wooden chairs and a long bench.  I like the casual look of the mixed seating but wonder if a bench would just be too big and bulky.

We also attempted to tape out the cabinets.  I say attempted because I'm pretty sure we weren't all that close.  Between a certain two-year old that liked to move the tape, the tape not sticking well to the texture residue on the floor covering and a cheap tape measure, we gave up before we'd finished.




Can you tell how excited a certain someone was to be out there?  His patience is wearing thin now that he can't run between walls and get into things.  I can't say I blame him, though.  Drywall isn't really all that entertaining.



The other thing accomplished that week (on Friday, day 103) was the wall texture being applied.  Nothing too exciting about this photo, but the walls have since been painted and I'm anxious to get out to the house to see the colors up.  Fingers crossed the colors actually match the small swatches I selected them from and I'm happy with the results!

Thursday, February 14, 2013

day 102

I feel like we should have had a big 100 day celebration... but I totally missed it.  Ooops.  Instead, want to see what has happened up until day 102?


Here's the high level summary:
Day 96/97 - drywall work - taping and mudding
Day 98 - rest day!
Day 99/100 - drywall work - sanding and touchups
Day 101/102 - stone work and cabinet delivery

And the proof is in the details:

[master bedroom - see the boards on the floor?  they're hiding a hole.]
[pretty purple master bath]
[nice and smooth kitchen and living room]

We had been to the house on Saturday (day 97) and were aware that the drywall work had been started.  I was awarded a (much needed) fun day with one of my girlfriends on Sunday and then I spent Monday through Wednesday avoiding/caring for the sick boys in my house.  Staying away to avoid sickness yet being around enough to provide care is an interesting balance.  The good news is, everyone seems to be healthy now!

So, all that to say - I hadn't been to the house since Saturday and was pleasantly surprised to see a crew out laying stone this morning.







I like the stone in person much more than I do in these photos.  Let's blame the iPhone camera?  I think I'll like everything even more once the front door is stained to match the garage doors.  And once the posts are finished.  I have the worst timing imaging how everything comes together.  Usually, I find a photo of what I like and then try to replicate it (e.g. our master bathroom).  For the exterior of the house, I really haven't been able to do that.  It drives me crazy.  But I think it drives my Hubby even more crazy.  If he hears another "I'm not sure" or "I don't think I like it anymore", I might be looking for a roommate!

The real reason for my visit to the house this morning was to accept delivery of our cabinets.  Aren't they pretty?



I'm super excited for them to be installed.  But first - priming, paint and floors.  We're getting closer!  I dropped off our paint samples with the Builder this morning and am told painting is supposed to start next week.  Then, some more magic and hopefully we'll be moving in towards the beginning of April.  My patience is getting thinner...especially as we start to get calls for showings again on the Condo.  As unready as I am to pack up and move again, I seriously can't wait to be in our house.  Our home.  This Condo still doesn't feel like home and I truly miss that feeling.

In the mean time?  I'll continue to love on the cuties I get to call my Valentines.  Aren't they sweet?