I slipped away to the house for a bit on Saturday morning to take photos before we started filling it up. Our walk-through was on Friday afternoon and we still have a punch list of items to complete, but I'm thankful we were able to receive occupancy and avoid a short-term hotel stay.

The punch list isn't too crazy and includes things like: patch drywall, touch up paint, install hood extender, replace master bedroom carpet, fix leaky sink, tighten tub faucet, finish installing plumbing fixtures, caulk around windows, shim squeaky floor, trim closet door, add additional shelf brackets, etc.

We also have a to-do list, which includes: hanging curtain rods/blinds, installing cabinet hardware, hanging bathroom fixtures (TP holders, towel rings, etc.) and installing the washer/dryer.  My father-in-law was able to get the hardware installed and we hung those temporary paper blinds over most windows.  Hubby took care of the washer/dryer and will start installing the remaining bathroom fixtures this week.  Progress!

In other words, it's mostly done.  But the contractors are working hard to make sure it's totally done soon.  The drywall guy, carpet crew, carpenter and plumbers were all here today.  And the painter is supposed to be coming tomorrow.  I'm finally seeing the light that we'll be wrapping up soon!

I'll continue to share photos as we personalize this house and make it our home, but I wanted to make sure I documented what it looked like on move-in day.

Without further ado...

[exterior - still need to paint trim, stain door and pour sidewalk/driveway]
[foyer - still need to stain door]
[living room from foyer - still need to touch up paint]
[fireplace]
[dining area from living room]
[flex room]
[living room from flex room]
[dining area - still need a great rug!]
[living room from dining area]
[dining area and my gorgeous handmade table]
[kitchen - before hardware was installed]
[kitchen - before hardware and hood extender]
[kitchen - before hardware]
[kitchen - before hardware]
[kitchen - before hardware]
[E's room from hallway]
[E's room/closet]
[E's room]
[main bath - before hardware, plumbing and mirrors]
[spare bedroom]
[spare bedroom/closet]
[powder room before pedestal sink]
[laundry room before washer/dryer]
[drop zone before hardware]
[hallway off kitchen - master bedroom at end, basement stairs on right]
[master bedroom]
[master bathroom]
[master bathroom tub]
[master bathroom vanity]
[master bathroom vanity]
[master bathroom shower]
[master bathroom shower]
[master bathroom]
[master bath vanity]
Hopefully I'll be back with moving stories and more interior shots later this week.  Until then, you'll find me unpacking, working and sleeping.

Monday, April 15, 2013

moving day

Saturday (day 160) was moving day!  We're officially out of the condo and into the house.  Lots to catch up on -- but first the boxes (or at least necessities) need unpacked.

Pre-move calm on Friday evening:

Mid-move craziness on Sunday afternoon:

More pictures and details to come! 

Tuesday, April 9, 2013

day 156

The carpet went in today... but I'm 97% certain that at least one of the rooms (our master bedroom/closet) is wrong.  In looking over our Change Order, it seems that the wrong name is written next to the correct three digit color code.  So, they must have ordered using the name.  Aye.


We called our Construction Manager and the Designer as soon as we discovered the issue but haven't heard anything back yet.  It'd be great if something went right this week.

Supposedly, we're still on track for an inspection Thursday and our walk-through on Friday.  Still crossing my fingers.  But still not totally believing it.

Breathe in.  Breathe out.  Pack another box.  Repeat.


Monday, April 8, 2013

day 154

Another quick update...wish I had time for something more lately!

Things were super busy at the house on Saturday.  The finish carpenter was on site to finish up the trim, install the mantel, hang a replacement door, finish the master bath vanity, install the porch columns and hang our bathroom mirrors.  He was all over the place!

 
The new mantel does not have an inset back like the old one did, so we were unable to mount the outlet on the mantel itself.  I was a little bummed, but I've always planned to have a large mirror or artwork sitting in the middle, so the outlet should be hidden.  I feel like our original mantel had a chunkier top, but I haven't bothered to find the photo to compare it.  If anything, we can always add trim to beef it up later.  More than likely, I'll forget I even thought to do that.

Also, while wondering the aisles of Target on Saturday, I think I might have found curtains for the two windows that flank the fireplace (and overlook our backyard/porch).  I want something that will allow light through, isn't horribly expensive and is at least 8' (our ceilings are 10').  Enter these:

[Nate Berkus Heathered Herringbone Window Panels from Target]
In other news - the master vanity is finally done!  I can't wait to see it all cleaned up and with the hardware installed.  The electrician hung the scones next to the mirrors today, but they're currently facing upwards and we'd asked for them to be installed downwards.  It's slowly coming together.



And, you can't really tell from the photos, but the columns look fantastic.  The carpenters did a really nice job.  I think the only things left to complete on the exterior of the house itself are staining the front door and painting the trim.



The electricians were also on site Saturday wrapping up the network connections and installing the rest of our bathroom and kitchen fixtures.  Hubby and I were discussing our favorite contractors the other night and the electricians were easily number one. We're trying to figure out a nice way to let them know how much we appreciate their help.  Any suggestions?  I've only come up with a couple of my very favorite screwdrivers.  But surely they have their own favorites.


Anyway, I'm dying to see the kitchen with the protective paper pulled off the floor!  And eventually with a tile backsplash and crown molding.  It's crazy that the "once we move in" project list has already begun.

But back to what has to get done immediately.

The painter came back on Saturday to do touch-ups, as well.  I'm much happier with everything now that the ceiling lines have been refined, walls have been touched up and the trim is much more crisp.

And the plumbers were also there.  They made quite a bit of progress running pipe in the basement, but were unable to get started on installing fixtures.  Unfortunately, there was a miscommunication with someone at the builder's office and all of the wrong fixtures were ordered.  They straightened everything out today (I hope - the Designer never called me back to verify) and we should now have new fixtures and the correct pedestal sink tomorrow or Wednesday.  Another delay.  

While we were all there together, though, they made a point to bring the tub up from the basement so we could let them know how we wanted it placed.  I'm in love!


And, more than ever, I'm glad we decided to go with the wainscoting around the tub instead of tile.  The tile looks great in the shower, but I really like the mix of materials.



Today, a crew worked on patching the drywall and getting ready for the rest of the touch-up paint.  It sounds like they also started cleaning out the basement.  I'm just glad that progress continues, since we're in such a time crunch to get out of the condo and into the house.  I'm on such pins and needles this week.  Ugh.

In exciting news, my father-in-law is making awesome progress on our dining table.  I can't wait to see the finished product, in person!


Note - I think the table legs are sitting upside down in this photo, but you get the idea.  It's large.  And gorgeous.  And amazing.

Hopefully more good news tomorrow... like painting and carpet and new plumbing fixtures.  One can hope!