Showing posts with label master bath. Show all posts
Showing posts with label master bath. Show all posts

Tuesday, April 16, 2013

day 160

I slipped away to the house for a bit on Saturday morning to take photos before we started filling it up. Our walk-through was on Friday afternoon and we still have a punch list of items to complete, but I'm thankful we were able to receive occupancy and avoid a short-term hotel stay.

The punch list isn't too crazy and includes things like: patch drywall, touch up paint, install hood extender, replace master bedroom carpet, fix leaky sink, tighten tub faucet, finish installing plumbing fixtures, caulk around windows, shim squeaky floor, trim closet door, add additional shelf brackets, etc.

We also have a to-do list, which includes: hanging curtain rods/blinds, installing cabinet hardware, hanging bathroom fixtures (TP holders, towel rings, etc.) and installing the washer/dryer.  My father-in-law was able to get the hardware installed and we hung those temporary paper blinds over most windows.  Hubby took care of the washer/dryer and will start installing the remaining bathroom fixtures this week.  Progress!

In other words, it's mostly done.  But the contractors are working hard to make sure it's totally done soon.  The drywall guy, carpet crew, carpenter and plumbers were all here today.  And the painter is supposed to be coming tomorrow.  I'm finally seeing the light that we'll be wrapping up soon!

I'll continue to share photos as we personalize this house and make it our home, but I wanted to make sure I documented what it looked like on move-in day.

Without further ado...

[exterior - still need to paint trim, stain door and pour sidewalk/driveway]
[foyer - still need to stain door]
[living room from foyer - still need to touch up paint]
[fireplace]
[dining area from living room]
[flex room]
[living room from flex room]
[dining area - still need a great rug!]
[living room from dining area]
[dining area and my gorgeous handmade table]
[kitchen - before hardware was installed]
[kitchen - before hardware and hood extender]
[kitchen - before hardware]
[kitchen - before hardware]
[kitchen - before hardware]
[E's room from hallway]
[E's room/closet]
[E's room]
[main bath - before hardware, plumbing and mirrors]
[spare bedroom]
[spare bedroom/closet]
[powder room before pedestal sink]
[laundry room before washer/dryer]
[drop zone before hardware]
[hallway off kitchen - master bedroom at end, basement stairs on right]
[master bedroom]
[master bathroom]
[master bathroom tub]
[master bathroom vanity]
[master bathroom vanity]
[master bathroom shower]
[master bathroom shower]
[master bathroom]
[master bath vanity]
Hopefully I'll be back with moving stories and more interior shots later this week.  Until then, you'll find me unpacking, working and sleeping.

Monday, April 8, 2013

day 154

Another quick update...wish I had time for something more lately!

Things were super busy at the house on Saturday.  The finish carpenter was on site to finish up the trim, install the mantel, hang a replacement door, finish the master bath vanity, install the porch columns and hang our bathroom mirrors.  He was all over the place!

 
The new mantel does not have an inset back like the old one did, so we were unable to mount the outlet on the mantel itself.  I was a little bummed, but I've always planned to have a large mirror or artwork sitting in the middle, so the outlet should be hidden.  I feel like our original mantel had a chunkier top, but I haven't bothered to find the photo to compare it.  If anything, we can always add trim to beef it up later.  More than likely, I'll forget I even thought to do that.

Also, while wondering the aisles of Target on Saturday, I think I might have found curtains for the two windows that flank the fireplace (and overlook our backyard/porch).  I want something that will allow light through, isn't horribly expensive and is at least 8' (our ceilings are 10').  Enter these:

[Nate Berkus Heathered Herringbone Window Panels from Target]
In other news - the master vanity is finally done!  I can't wait to see it all cleaned up and with the hardware installed.  The electrician hung the scones next to the mirrors today, but they're currently facing upwards and we'd asked for them to be installed downwards.  It's slowly coming together.



And, you can't really tell from the photos, but the columns look fantastic.  The carpenters did a really nice job.  I think the only things left to complete on the exterior of the house itself are staining the front door and painting the trim.



The electricians were also on site Saturday wrapping up the network connections and installing the rest of our bathroom and kitchen fixtures.  Hubby and I were discussing our favorite contractors the other night and the electricians were easily number one. We're trying to figure out a nice way to let them know how much we appreciate their help.  Any suggestions?  I've only come up with a couple of my very favorite screwdrivers.  But surely they have their own favorites.


Anyway, I'm dying to see the kitchen with the protective paper pulled off the floor!  And eventually with a tile backsplash and crown molding.  It's crazy that the "once we move in" project list has already begun.

But back to what has to get done immediately.

The painter came back on Saturday to do touch-ups, as well.  I'm much happier with everything now that the ceiling lines have been refined, walls have been touched up and the trim is much more crisp.

And the plumbers were also there.  They made quite a bit of progress running pipe in the basement, but were unable to get started on installing fixtures.  Unfortunately, there was a miscommunication with someone at the builder's office and all of the wrong fixtures were ordered.  They straightened everything out today (I hope - the Designer never called me back to verify) and we should now have new fixtures and the correct pedestal sink tomorrow or Wednesday.  Another delay.  

While we were all there together, though, they made a point to bring the tub up from the basement so we could let them know how we wanted it placed.  I'm in love!


And, more than ever, I'm glad we decided to go with the wainscoting around the tub instead of tile.  The tile looks great in the shower, but I really like the mix of materials.



Today, a crew worked on patching the drywall and getting ready for the rest of the touch-up paint.  It sounds like they also started cleaning out the basement.  I'm just glad that progress continues, since we're in such a time crunch to get out of the condo and into the house.  I'm on such pins and needles this week.  Ugh.

In exciting news, my father-in-law is making awesome progress on our dining table.  I can't wait to see the finished product, in person!


Note - I think the table legs are sitting upside down in this photo, but you get the idea.  It's large.  And gorgeous.  And amazing.

Hopefully more good news tomorrow... like painting and carpet and new plumbing fixtures.  One can hope!

Saturday, April 6, 2013

day 152

1. It's quarter end and I work in accounting.  Enough said.

2. The condo sold.  We found out Monday night when our landlord called to say there was an inspection scheduled for Wednesday.  The sales contract says tenants have to be out 15 days prior to closing, which means we're supposed to be out on April 15.  10 days from now. (insert mini panic attack)

3. Our Construction Manager's last day with the company is this coming Monday -- April 8.  We found that out on Tuesday. (insert second mini panic attack)

4. On Wednesday, we had a painter come out to paint the master bedroom, powder room, living room/foyer and E's room.  I'd intended to do it myself, but we're running out of time. With the condo selling, I won't have a gap between the house being done and being able to move, so we just hired it out.  I was unimpressed with the work.  (insert third mini panic attack)  He's coming back tomorrow morning to finish touch-ups and clean up his lines.  Crossing my fingers he's able to meet my expectations.

5. We found out Thursday that the hood vent we received (which was actually an upgraded newer model) does not currently have an extender being made for it.  And, without the extender, it's not tall enough for our ceilings.  After lots of back and forth with the appliance company, they found us a new hood (which is the older model) out of California, along with an extender.  Hopefully it arrives next Thursday (April 11) as expected.  The installer is slated to be there first thing Friday morning to get it in.

[36" Stainless Chimney Hood by Best]
6. Our new Construction Manager continues to assure us we'll be in by April 15 (the completion date per our contract and now the day we have to be out of the condo we're renting).  He's tentatively scheduled our occupancy inspection with the Village for next Thursday.  Like 6 days from now.  Day 158.  I'm not totally convinced it's going to happen.

7. W'e're hoping to be able to do our final walk-through and punch list on Friday (day 159) and then be able to move over the weekend.  It gets us out of the condo on time, but it also means we'd be living in the house while they're doing the finishing touches.  Not ideal, but it's going to have to work.

8.  Speaking of the painter coming, I had to pick out more paint colors.  Because of the craziness at work, it involved my Hubby grabbing paint samples from Sherwin Williams and me spreading them out over the kitchen table at 10 pm, trying to pick paint with tired eyes via poor overhead lighting.  While I didn't like the paint job, I like the colors.  One small victory!  Our house palette now looks like this:

Master Bedroom - On the Rocks
Main Bath - Nantucket Dune
E's Bedroom - Versatile Gray
Master Bathroom - Perfect Greige
Kitchen/Dining Area - Gray Clouds
Living Room/Foyer - Gray Clouds
Powder Room - Copen Blue

9. Our master shower is finally tiled!  I love the tile work.  But I'm not sure how I feel about the granite seat and ledge.   I thought it was all going to be tile.  At first I was insistent that the granite come out but the Designer talked me out of it.  He assures me I'll be happier with how the granite holds up in the long run.  I still don't like the look, but practicality wins out again.  I really hope the granite grows on me once everything else starts to be added to the bathroom.


The missing tiles have since been installed but I haven't taken a photo for some reason.

10.  The fireplace tile has also been installed.  I like the wall tile, but I'm a bit undecided on the floor tile.  Does anyone else notice the front right tile?  I know it's natural stone and the colors will vary, but it's the only tile that light.  And I think it looks odd.  The tile guy's solution was to pull a few of the darker tiles out and replace them with a couple leftover tiles that were lighter.  But, because the tiles were wet when I went out to see if I liked it, it still looked the same.  The replacement (and larger) mantel has also arrived and been primed.  I believe it will be installed by the trim carpenter tomorrow.



11. The electricians came out and installed a few more of our lights.  They'll be out again tomorrow to wrap up.


12. Our appliances were delivered last Saturday (day 146) and were installed on Monday (I think?).  The pictures below were taken on Easter, pre-installation (and mid egg hunt!).



13.  We celebrated Easter with an egg hunt at the house.  E was glad the Easter Bunny found him!  And we were thrilled to start making family memories in our new home.




 



14.  Tomorrow is going to be a crazy day!  The painter, electrician, trim carpenter and plumber will all be there.  I think the biggest items left to complete are: paint touch-ups, finish trimwork, install mantel, finish hanging lights, hang mirrors, install carpet and transition pieces, plumbing, complete front porch columns, rough grading, put in temporary driveway/sidewalk and then CLEANING.  It's a tight timeline!  Hopefully more updates tomorrow once everyone has gotten in there and worked their tails off.  I stocked up on Gatorade, water and am baking cookies to drop off in the morning.  I'm hoping a little bribery will go a long way!